AI developed the AGL automation program and supervision system for the Auxerre airport in 2004 .
This installation is organized around a Premium PLC. This site was the first to be programmed in Unity.
Following this achievement the airport could be classified in Category I.
AI entrusted the realization of the centralized electrical supervision of the airports of Mvengue ( Gabun), Cotonou ( Benin) and Garoua ( Cameroon).
The supervision aims at watching and recording all the events of the electric distribution LV and HV of the site as well as the gensets, the UPS and the chargers. The supervision also control and monitor the complete airfield lighting system.
AI entrusted the realization of the centralized electrical supervision of the airports of Mvengue ( Gabun), Cotonou ( Benin) and Garoua ( Cameroon).
The supervision aims at watching and recording all the events of the electric distribution LV and HV of the site as well as the gensets, the UPS and the chargers. The supervision also control and monitor the complete airfield lighting system.
AI developed in 2002 the airfield Lighting control and monitoring system for Dubai’s Al Nakheel air base in 2007.
This fully-secured installation offers airfield lighting control via a control desk with push buttons or a touch-screen PC. Operating and fault information is displayed via both the control desk and supervision interface.
Redundant PCs and power supplies and reliable PLC equipment ensure uninterrupted service.
AI developed in 2002 the airfield lighting control and monitoring system for Aleppo airport in Syria.
This fully-secured installation controls the runway and taxiway lighting system.
Redundant PCs and power supplies and reliable PLC equipment ensure uninterrupted service.
With the renovation project of B.A. 105 lighting equipment in Evreux, AI to modernized the control command and oversight of airfield lighting.
AI workers have completed this project despite a short period of 3 months. The A.I. expertise in control of airfield lighting helped to provide a simplified and intuitive operator interface. 5 supervisors, 1 PLC and 2 control panels were installed to ensure an adapted use for each service and the reliability of the installation.