AI worked on the DUNG QUAT refinery project in partnership with a major electrical devices supplier, during the specification process and also during the programming of PLC and HMI software.
Main functional features:
Technical features:
This site architecture includes 7 extraction modules equipped with PLCs on a fiber-optic network and a main station with redundant PLCs.
A company of electricity supply brought in AI to assist with commissioning during the overhaul and expansion of a crude oil collection installation in the Libyan desert.
While upgrading the complete Electrical control and Supervision System at the Meridien Hotel in Dakar, AI first adapted it to the existing system and replaced the PB400 type PLC with a Schneider Premium and 3 Micro PLC in different vaults.
Our team then replaced the supervision SCADA to allow for optimized and safe electrical management.
Operation with any electrical black-out.
AI provided the Building Management System (BMS) for the new NHRA hospital in Annecy, France. The system handles more than 4,000 control points spread across seven concentrator PLCs, six operating PCs, and a standby call system.
AI won a contract to integrate Hot Stand by redundancy to SABINE, a generic electrical loop reconfiguration system. This generic system can be installed at any facility that has the appropriate architecture. The availability of this system is significantly increased.
Main functions:
Designed and tested fully platform through simulation scripts HTA system.
AI worked with two international tenders on the “Electrical Monitoring and Control System” for royal settlements in Saudi Arabia.
12 sites installed: LHPR (luxury Hotel), Janadria site, Riyhad palace, ORB (conference room), Al Salam palace, army training center...
Main Functional features: