Your turnkey solutions in automation and energy management 

Introduction of a spin line

Introduction of a spin line

This firm is specialised in packaging cardboards, in particular wine cardboards from the region (Croze Hermitage).  They built a spin line of wet cardboard that just fit in parallel of a production line. In this context AI had to develop the automation program, to manage an accessible archiving via ADSL and to develop an HIM on the electrical cabinet door.

Installation room NEO2

Installation room NEO2

AI is a technical sub-contractor  at a company of cathodic products, to help in the development and in the starting of PLC programs associated to operator Terminal called HMI (Human Machine Interface) in order to monitoring and managing the specific glucose and glycerin binders as raw material in the manufacturing of carbonaceous paste said “Lining paste".

The main objective of this project is to optimize and to improve the quality of production of these binders, to pilot it from a terminal operator and to make the change of measure equipments and motorized valves allowing to increase the dosage accuracies of these various binders to be produced.

Demodulation pond

Demodulation pond

La Bâthie hydroelectric Central demodulation pond: in order to exploit groups more quickly and more effectively, a pool of demodulation and a control valve are arranged on the tailrace canal. This channel drain turbined water in Isère. AI developed the whole project of automatism managing valve and demodulation pond.

Information and Energy management system

Information and Energy management system

As part of an effort to improve energy performance, a foundry wanted to use a software tool to perform analyzes on its consumption.
Automatique & Industrie has integrated Information and Energy Management System  according to their requirements: the Energy eSight solution.

So the factory analyses its consumption, evaluates energy savings actions, identifies deviations, negotiates its energy contracts and realizes indicators performance monitoring under an ISO 50001 process.

Programmation poste de livraison

Programmation poste de livraison

AI has been chosen by a company producing electronics chips, for the programmation of the PLC of the new high voltage delivery position Schneider.   The objective is to collect information from cells high voltage to climb it up to the supervision of the site system.   AI therefore could demonstrate its experience both in terms of land and power management bus.

Renovation of the dam ok Kembs

Renovation of the dam ok Kembs

During major floods there is a significant raising of the level of reach. In the case of Kembs’ dam this level rise may affect the integrity of structures (breach of the seawalls or the dam itself) as well as the flooding of the city of Basel (Switzerland) are a risk for people and goods.

In this context AI completed the Detailed Preliminary Study of a backup device to guaranty a Rhine level compatible with these constraints. This automatic device evacuate flood through the sluice gates of the dam